INSTALLATION CHECKLIST
Time will be dependent on temperature, humidity, airflow and substrate absorbency.
Temporary Protection:
Caution:— If impervious protective covering materials are applied over the newly installed product, condensation may collect and cause serious damage to the floor covering and/or bond strength of the floor covering to the substrate. (AS/NZS:2455.1:2019). This will void manufacturer’s warranty.
DIRECT STICK:
Adhesive: tretford 240
tretford to substrate – V2 (2.4mm) notched trowel (3m² p/ltre)
DUAL BOND:
Adhesive: tretford 240
Underlay to substrate- V1 (1.6mm) notched trowel (5m² p/ltre)
tretford to Underlay – V2 (2.4mm) notched trowel (3m² p/ltre)
Underlays:
– Airstep BOUNCE 470 – 4.7mm
– Airstep BOUNCE 650 – 6.5mm (Domestic only)
DIRECT STICK:
Adhesive: SynSisal S340
SynSisal to Substrate – V2 (2.4mm) notched trowel (3m² p/ltre)
DUAL BOND:
Adhesive: SynSisal S340
Underlay to Substrate – V1 (1.6mm) notched trowel (5m² p/ltre)
SynSisal to Underlay – V2 (2.4mm) notched trowel (3m² p/ltre)
Underlays:
– Airstep BOUNCE 470 – 4.7mm
– Airstep BOUNCE 650 – 6.5mm (Domestic only)