tretford
INSTALLATION CHECKLIST
Time will be dependent on temperature, humidity, airflow and substrate absorbency.
DIRECT STICK:
Adhesive: tretford 240
Substrate to tretford – use V2 (2.4mm) notched trowel (3m² per litre)
DUAL BOND:
Adhesive: tretford 240
Substrate to underlay – use V1 (1.6mm) notched trowel (5m² per litre)
Underlay to tretford – use V2 (2.4mm) notched trowel (3m² per litre)
Underlays:
– Airstep BOUNCE 470 – 4.7mm
– Airstep BOUNCE 650 – 6.5mm (Domestic only)
– Dunlop TECHNICS 5 – 5mm
– Dunlop PERFORMA 5 – 5mm
– Dunlop DURAFIT 7 – 7mm (Domestic only)
Caution:— If impervious protective covering materials are applied over the newly installed product, condensation may collect under the covering and cause serious damage to the textile floor covering and/or bond strength of the textile floor covering to the substrate. ( AS/NZS:2455.1:2019)