tretford Installation Guide
INSTALLATION CHECKLIST
DIRECT STICK:
Adhesive: tretford 240
tretford to substrate – V2 (2.4mm) notched trowel (3m² /L)
DUAL BOND:
Adhesive: tretford 240
Underlay to substrate – V2 (1.6mm) notched trowel (5m² /L)
tretford to Underlay – V2 (2.4mm) notched trowel (3m² /L)
Underlays:
* Please note: Gibbon Architectural does not supply underlays.
Adhesive: Modu-Tak
Apply using V1 notched trowel
Lay Method:
tretford TILE can only be quarter-turned
Time will be dependent on temperature, humidity, airflow and substrate absorbency.
Temporary Protection:
Caution:— If impervious protective covering materials are applied over the newly installed product, condensation may collect and cause serious damage to the floor covering and/or bond strength of the floor covering to the substrate. (AS/NZS:2455.1:2019). This will void manufacturer’s warranty.
For any installation queries, please contact us at the following.
+61 7 3881 1777 (Option #2)